Capri2.8i wrote:
Is there ever going to be a Hazel Grove by-pass?
This could possibly spawn an entire thread of its own.
(topic split by moderator)
The Highways Agency had a plan to built the A6(M) Stockport North-South bypass (including bypassing Hazel Grove) - along with the A555 extension from its current eastern end to meet the A6(M); extension of the A555 west to meet the M56 at Junction 5, and an A523 Poynton bypass. All of the roads were to be dual carriageways with grade-separated (i.e. motorway style) junctions throughout. Also in the pipeline was a bypass for Disley and High Lane on the A6.
The A555 currently built was finished in 1995 along with the A34 Wilmslow-Handforth bypass - the rest was shelved by John Prescot in 1998 as part of the "trunk road review", along with many other schemes around the UK.
SEMMMS (South East Manchester Multi-Modal Study) recommended using the protected corridor for this route, but with the roads built "to a more appropriate standard" - i.e. with traffic lights instead of motorway style junctions, a 40mph design speed, and a single-carriageway A523 bypass. THe Disley-High Lane bypass was shelved completely. This in my opinion is madness and is bound to be under-capacity. A public consultation happened quite some time ago, but it's now gone strangely quiet for about the last year - last I heard that there were some funding issues.
If anyone wants to see where the A6(M) would have gone, then then try
here
link to the wider site